1899 | - the company Hassmann & Sohn was established
|
1947 | - the company Ondřejovická strojírna was established - production of stone-cutting machines, Ondřejovice - Salisov
|
1964 | - the first pressure tank was produced
|
1984 | - the construction of the new production hall K1 was completed
|
1992 | - the company Ondřejovická strojírna, spol. s r.o. was established
- the first distillation columns for the company Sokolovska uhelna were produced
|
1994 | - mastering of stainless materials welding by the MIG/MAG method
|
1995 | - stuffing-box-less tanks were granted the "Czech made" brand
- we were granted the certificate for welding coefficient 0.95 for manual welding
|
1996 | - we were awarded the certificate ASME Code for the production of pressure tanks
- introduction of automatic welding under the flux
|
1997 | - floods in Norther Moravia - the plant was not severely damaged
- mastering of the first production of pressure tanks according to ASME Code
- we were granted the certificate for producing pressure components for nuclear energetics
|
1998 | - CNC workplace for marking and burning materials introduced
- orbital welding tube-tube plate was established
- the company Ondřejovická strojírna registered in the USA as a producer of pressure tanks
|
1999 | - gas distribution system was completed
|
2000 | - realisation of an ecologic program - construction of water tank and wetland in the company premises
- we were granted the certificate according to AD Merkblatt (AD 2000)
|
2001 | - the first tanks according to AD Merkblatt were produced
|
2002 | - the company information system SiteLine and Apso was introduced
- introduction of stainless materials welding with tube wire
|
2003 | - mastering the production of vessels coated with pressed half-tubes
- production of welding-on of tube plates under automatic machine was introduced
-
| production of exchangers from duplex materials | |
2004 | - the cooperation in producing tanks and exchangers for the company DUPONT has started
- production of columns from monel materials
|
2005 | - the company was certified according to GOST R for vessels, columns up to 100 m3 and exchangers with heat-mixing area up to 1000 m2
|
2006 | - the certification GOST R was extended for columns up to 200 m3
- the company was successfully certified according to ROSTECHNADZOR (before GOSGORTECHNADZOR) for vessels, columns and exchangers
|
2007 | - the four-roll plate bending machine from the company FACCIN was installed, it gave us the possibility of roll bending up to a thickness of 40 mm
- bridge crane was installed to KI
- the upgrade of the information system Syteline 5 to Syteline 7 has started
|
2008 | - ASME Code Sect VIII-DIV 1 "U" Stamp - the re-certification was valid till April 2011
- ASME Code Sect VIII-DIV 2 "U2" Stamp - the re-certification was valid till April 2011
- PED 97/23/CE MODUL H(H1) - the re-certification was valid till January 2011
- GOST R - the re-certification for delivery of exchangers, columns, containers was valid till April 2011
- the information system Siteline 7 was launched- full launch from July 2008
|
2009 | - certifications: ISO 9001:2001, 14001:2005 a OHSAS 18001:2008
- we were granted the certificate of speciality according to ČSN EN ISO 9001, 14001, 3834 a ČSN OHSAS 18001
- certification of the company by Promatomnadzor
- the company was awarded in the program National Quality Award 2099 as "Sucessful company"
|
2010 | - the companies Ondřejovická strojírna spol. s r.o. and Fagonia Consulting merged => the company Ondřejovická strojírna a.s. has been established
- certification of the company by Rostechnadzor
- the first supervisory audit of ISO was successfully completed
- the company joined the employee development professional program called "Educate yourself!"
|
2011 | - recertification of the GOST R for supply of heat exchangers, columns and vessels
- recertification of the ASME Code Sect VIII-DIV 1 "U " and ASME Code Sect VII, Div 2 "U2 "
- the construction of a new factory building "D" was started
|
2012 | - recertification of the management system QMS, EMS and OHSAS according to ČSN EN ISO 9001:2009, ČSM EN ISO 14001:2005, ČSN OHSAS 18001:2009 and ČSN EN ISO 3834
- the construction of the new factory building "D" was finished, as well as the renovation of old factory building and reconstruction of parking place for employees
- the EU grant programs "Investments" and "Development" were obtained
- certification of the company by Petrobras
|
2013 | - recertification of the company by Promatomnadzor
|
2014 | - recertification of the ASME Code Sect VIII-DIV 1 "U " and ASME Code Sect VII, Div 2 "U2 "
- EAC certification for the delivery of exchangers, collumns and vessels with validity till November, 2019 according to the conditions of Customs Union (Russia, Belarus, Kazakhstan)
- the information system Syteline 7 was upgraded to Syteline 8
|
2015 | - the recertification of the management system QMS, EMS and OHSAS according to ČSN EN ISO 9001:2009, ČSM EN ISO 14001:2005, ČSN OHSAS 18001:2009 and ČSN EN ISO 3834
- there was the EAC supervisory audit according to the special regulations TR 010/2011 and TR 032/2013 for production and delivery of pressure vessels, heat exchangers and columns to the Customs Union of the Russian Federation, Belarus, Kazakhstan and Armenia.
- the technology was installed and put into operation according to the conditions of the grant program – DEVELOPMENT – Call III, a second prolongation.
|
2016 | - there was the first supervisory audit of the recertification of management system QMS, EMS and OHSAS according to ČSN EN ISO 9001:2009, ČSN EN ISO 14001:2005, ČSN OHSAS 18001:2009 and ČSN EN ISO 3834; the EAC supervisory audit according to the special regulations TR 010/2011 and TR 032/2013 for production and delivery of pressure vessels, heat exchangers and columns to the Customs Union of the Russian Federation, Belarus, Kazakhstan and Armenia; the technology was installed and put into operation according to the conditions of the grant program – DEVELOPMENT – Call III, a second prolongation.
- there was the EAC supervisory audit including issue of new certificates
- an energy audit took place with focus on savings of all energies
- Employee retraining project
- the management of orders has become transparent.
- design and manufacture of universal equipment for assembly of the heat exchanger tube bundles in the following design:
- a device for lever bending – Z160067 type
- - a fixture for tube insertion – ZA2238
|